Installation Requirements for Manufactured Homes Being Fianaced Through FHA!
|
|
Concrete foundation with anchoring in perimeter footing.
All pier stacks sure walled/bonded to pier footings.
Brick foundation wall with proper ventalation & access door.
Platform steps (3x3) in place of standard steps.
Termite soil treatment.
Engineer certification on foundation & complete installation.
|
|